Fethiye Mayor Behcet Saatci inspected the ongoing city-wide activities of the municipality before the summer season. Receiving information about works continuing at various points concurrently, Saatci also exchanged views with citizens. His first stop was the çalış area, where comprehensive road works are in progress. As well as the stretch between the Aries junction and the çalış bridge, Saatci inspected the side roads, and exchanged views with Feski Director Mete Karacadağ about the parking space problem brought up by the çalış Tourism and Solidarity Association. Asking that the green area behind the taxi stop be used for parking without changing its characteristics, Saatci enquired about the procedure to be followed. Moving on to Namık Kemal Boulevard, Saatci inspected the area where cobblestones are being laid. The next stop of Mayor Saatci, accompanied by the Feski Director Mete Karacadağ, was the area in front of the Justice Hall, where a sidewalk was being built. After finishing his inspections there, Saatci moved on to inspect the canal that carries the underground waters to the sea at Çalış. The Mayor tested the canal that moves the water 1-2 meters under sea level, and tried to determine the direction of the water flow.